Article R4532-50
The general coordination plan kept on site may be consulted by : 1° The members of the social and economic committees called upon to intervene on the site; 2° The works doctor; 3° The members of the i…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 10811–10820 of 14204 articles for “Art. 1°”
The general coordination plan kept on site may be consulted by : 1° The members of the social and economic committees called upon to intervene on the site; 2° The works doctor; 3° The members of the i…
…inter-company committee with all the information it needs to carry out its duties, in particular : 1° The major accident prevention policy they are implementing; 2° The safety management systems impl…
…where applicable, under the preventive measures provided for in articles L. 4121-3 and L. 4121-4: 1° Workstations which cannot be assigned to employees holding a fixed-term employment contract or to…
…slides or falling boulders are prevented, using methods appropriate to the height of the structure: 1° Either by means of a supported or suspended support and a lining appropriate to the nature of the…
The specific safety plan indicates: 1° The name and address of the contractor; 2° The foreseeable changes in the number of people working on the site; 3° Where applicable, the name and position of the…
…by the project owner to contractors intending to enter into a contract. In particular, it sets out: 1° Administrative information relating to the worksite, and in particular that which completes the p…
…in the case of work on public property, or from the owner in the case of work on private property: 1° The possible existence of soil deposits; 2° The location and nature of any underground pipes or c…
The specific safety plan includes the following details: 1° Rescue and evacuation arrangements, in particular : a) First aid instructions for accident victims and the sick; b) The number of site worke…
The three levels of health and safety coordinator competence are: 1° Level 1: ability to coordinate all operations; 2° Level 2: ability to coordinate second and third category operations; 3° Level 3:…
…the installations needed to house the facilities of these buildings. This article does not apply to 1° To pyrotechnic activities whose operating mode requires buildings with workstations on several le…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More