Article R4227-54
The explosion protection document is drawn up before work begins and is revised when significant changes, extensions or alterations are made, particularly to the premises, work equipment or work organ…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 4261–4270 of 17871 articles for “Art. 1242 al. 5”
The explosion protection document is drawn up before work begins and is revised when significant changes, extensions or alterations are made, particularly to the premises, work equipment or work organ…
Each passageway has a minimum passage width proportionate to the total number of people using it. This width is calculated on the basis of a standard passage unit of 0.60 metres. However, when a clear…
The employer shall subdivide the areas in which explosive atmospheres may occur into zones and shall ensure that the minimum requirements for the protection of workers are applied in these areas. Join…
The manufacturer undertakes to fulfil all the conditions necessary for the approved quality system to remain effective.
…13-44 as well as the decisions and reports provided for in articles R. 4313-48, R. 4313-49, R. 4313-53 and R. 4313-54.
…the matter is referred remains silent for more than four months in the event of a hierarchical appeal.
The "EC quality assurance system" is the procedure whereby a notified body certifies that the manufacturer has taken all necessary measures to ensure that the manufacturing process, including final in…
The CE marking shall be affixed by the manufacturer, importer or any other person responsible for placing the machinery or personal protective equipment on the market, certifying that it conforms to t…
For each model of personal protective equipment manufactured, a notified body chosen by the manufacturer shall take an adequate sample of the personal protective equipment at random intervals, at leas…
The notified body checks, by means of surveillance, that the manufacturer duly fulfils the obligations arising out of the approved quality assurance system.
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More