Article R4534-105
The design of shoring with a height of more than six metres is justified by a calculation note and its construction is carried out in accordance with an assembly plan drawn up in advance, except in ca…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 2921–2930 of 7488 articles for “Art. 1536 combined with Art. 1581 s.”
The design of shoring with a height of more than six metres is justified by a calculation note and its construction is carried out in accordance with an assembly plan drawn up in advance, except in ca…
The removal of hangers and formwork and the removal of the framework supporting these installations may only be carried out under the supervision of a competent person appointed by the employer.
On work sites where the duration of the work exceeds one week, the employer shall give notice of the address or telephone number of the emergency service to contact in the event of an accident.
The study shall be entrusted to a person competent in the field of risk prevention and familiar with the provisions applicable to the work referred to in Article R. 4543-1 as well as the regulatory pr…
Except in the case provided for in article R. 4543-5, the specific safety study remains the property of the contractor. A copy is given to the owner of the equipment.
…cific safety study summarises all the risks identified. This summary may be produced using pictograms. Where the nature of the risk requires special preventive measures to be taken, the material safet…
The material safety data sheet must be kept permanently available to the workers of the company working on the lift, either in the lift or goods lift machinery room, or in a nearby location in the cas…
The provisions of sections 2 to 6 of this chapter are applicable, without prejudice to those of Title I of this book, to inspection, maintenance and technical control work, as well as to repair and co…
For each piece of equipment used in the course of the work referred to in Article R. 4543-1, the specific safety study supplements the single risk assessment document of the company carrying out the w…
…arrying out the work shall take the necessary preventive measures to eliminate the risks associated with the simultaneous activity of these workers and to ensure satisfactory communication between the…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More