Article R4534-53
When a gallery is cut through ground where there is a risk of sudden and significant water ingress, the gallery must have exits enabling workers to be evacuated quickly. Failing this, appropriate meas…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 3231–3240 of 7488 articles for “Art. 1536 combined with Art. 1581 s.”
When a gallery is cut through ground where there is a risk of sudden and significant water ingress, the gallery must have exits enabling workers to be evacuated quickly. Failing this, appropriate meas…
The safety protocol is drawn up as part of an exchange between the employers concerned, prior to the operation being carried out. Each operation which is not of a repetitive nature as defined in artic…
…provides sufficient power to supply the various equipment and installations in the workers' premises.
…duced under articles R. 4534-44 and R. 4534-45 are increased so that air quality remains compatible with the health and safety of workers.
When explosives are used or when work is carried out in ground containing free silica, the spoil is watered.
Loading and unloading operations are covered by a written document known as a "safety protocol", which replaces the prevention plan.
…rks and waste disposal under conditions such that the premises intended for the site workers comply with the provisions applicable to them in terms of health and safety at work. The project owner take…
…rilled or a shaft is sunk in rock containing free silica, only water-injected foils or foils fitted with an effective dry dust collection device are used. Instructions indicate the workstations where…
…h a way as to ensure an adequate supply to the various water points provided in the workers' quarters.
A loading or unloading operation is defined as the activity involved in placing or removing products, funds and valuables, equipment or machinery, waste, objects and materials of any kind on or in a r…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More