Article R4226-12
The conditions of use and connection of removable electrical equipment are laid down by order of the ministers responsible for labour and agriculture.
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 9181–9190 of 24245 articles for “Art. 1843-4”
The conditions of use and connection of removable electrical equipment are laid down by order of the ministers responsible for labour and agriculture.
The conditions of use and maintenance of emergency lighting are laid down by order of the ministers responsible for labour and agriculture.
In order to take the appropriate safety measures, if necessary, and before starting any earthworks, the employer must obtain information from the relevant road authority in the case of work on public…
Openings or differences in level in the floor of a gallery, narrow passages, lowered vaults and any obstacles which may present a danger or hindrance to the movement of workers, vehicles or convoys ar…
Trees, boulders, equipment, materials and objects of any kind in the vicinity of the site where excavations are being undertaken must be removed or securely held when it appears that their equilibrium…
In the absence of sufficient lighting in galleries where vehicles or convoys are in use, workstations are indicated by highly visible lights and vehicles or convoys are fitted with: 1° A white light a…
Undercutting may only be carried out using mechanically powered equipment and provided that it does not result in any danger to workers. When such work is carried out, measures must be taken to preven…
In order to prevent spoil, materials, tools or objects of any kind from falling into trenches more than 1.30 metres deep, the trenches must be surrounded by plinths at least 15 centimetres high or hav…
Spoil or material may only be deposited along a trench more than 1.30 metres deep if it is possible to create a berm at least 40 centimetres wide. This berm must be kept clear of any deposits at all t…
After a period of rain or frost, the slope of the excavation or trench is examined. If necessary, the shoring is consolidated. The employer shall have this examination carried out by a competent perso…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More