Article R4534-78
…1° Guardrails consisting of two rails, one one metre and the other 45 centimetres above the floor; 2° Skirting boards at least 15 centimetres high. However, these provisions do not prevent the instal…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 10571–10580 of 14014 articles for “Art. 2°”
…1° Guardrails consisting of two rails, one one metre and the other 45 centimetres above the floor; 2° Skirting boards at least 15 centimetres high. However, these provisions do not prevent the instal…
…ed: 1° Either canopies, fans or floors capable of preventing a free fall of more than three metres; 2° Or nets, or any other device of at least equivalent elasticity, capable of preventing a free fall…
…1° Sanitary facilities, as set out in articles R. 4228-2 to R. 4228-7 and R. 4228-10 to R. 4228-18; 2° Catering, as set out in articles R. 4228-22 to R. 4228-25, may be waived for work sites lasting n…
…r to the start of the work, the employer: 1° Shall have the necessary protective devices installed; 2° Shall inform the workers, by means of written instructions, of the protective measures to be impl…
…for the use of work equipment and means of protection set out in articles R. 4321-1 to R. 4321-5 ; 2° Obligation to maintain compliance as set out in article R. 4322-1 ; 3° Rules for installing and u…
…fort required, the characteristics of the working environment and the requirements of the activity; 2° Individual risk factors, as defined by joint order of the ministers responsible for labour and ag…
…ception of operations undertaken by a private individual for his own personal use as referred to in 2° of article L. 4532-7. Similarly, compliance with the provisions of the first and second paragraph…
…nd sanitation rules provided for in articles R. 4222-1 to R. 4222-17 and R. 4222-20 to R. 4222-22 ; 2° Rules relating to the thermal environment, cold and bad weather provided for in articles R. 4223-…
…ardous chemical agent s: 1° Scope an d definitions provided for in articles R. 4412-1 to R. 4412-4; 2° Risk assessment provided for in articles R. 4412-5 to R. 4412-8 and article R. 4412-10; 3° Measur…
…oyer: 1° Does not order work to begin until he has checked that de-energising has been carried out; 2° Visibly indicates that de-energising has been carried out; 3° Protects himself against the accide…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More