Article R4462-17
…other levels, unless the workstations located on different levels are not occupied simultaneously; 2° Work on high explosive objects requiring the use of superimposed platforms. In the latter case, s…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 10651–10660 of 14014 articles for “Art. 2°”
…other levels, unless the workstations located on different levels are not occupied simultaneously; 2° Work on high explosive objects requiring the use of superimposed platforms. In the latter case, s…
…ed by compressors comply with the occupational exposure limit values laid down in this sub-section; 2° that the oxygen content of mixtures other than air complies with the occupational exposure limit…
…ad of the user undertaking: 1° Delimits the area in which the outside undertakings will be working; 2° Marks out the areas in this area which may present hazards for the workers; 3° Indicates the traf…
…re that they cannot cause dangerous reactions with the materials used in the pyrotechnic enclosure; 2° Pyrotechnic installations where substances or objects are handled which, due to the operations ca…
…ral services under the authority of the Minister of the Interior for option B "rescue and safety" ; 2° To the services placed under the authority of the director of the department of underwater and su…
…risks or when circumstances so require: 1° either general coordination within the user undertaking; 2° or coordination of the prevention measures for a given operation; 3° or coordination of the measu…
To obtain the accreditation provided for in 2° of Article R. 4461-29, the applicant organisation must meet the conditions laid down in the accreditation reference framework defined by the French Accre…
…three days before it takes place. In the event of an emergency, they will be informed immediately; 2° Of the date of periodic coordination inspections and meetings, no later than three days before th…
…where applicable, to the Organisme professionnel de prévention du bâtiment et des travaux publics; 2° The head of the user company must inform the Labour Inspectorate in writing of the start of the w…
…between whom the following functions are divided: 1° Operator working in a hyperbaric environment; 2° Assistant operator, responsible for the working environment of the operator working in a hyperbar…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More