Article R4462-33
For the application of this chapter, the Regional Director for Enterprise, Competition, Consumer Affairs, Labour and Employment or the authority that replaces him pursuant to Articles R. 8111-8 and R.…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 8081–8090 of 47428 articles for “Art. 3 mai 2007”
For the application of this chapter, the Regional Director for Enterprise, Competition, Consumer Affairs, Labour and Employment or the authority that replaces him pursuant to Articles R. 8111-8 and R.…
The prior declaration is sent to the labour inspector and to the bodies mentioned in article L. 4532-1 with territorial jurisdiction over the location of the operation. It shall be sent on the date of…
Repetitive loading or unloading operations are those involving products or substances of the same nature, carried out at the same locations, using the same operating procedures and employing the same…
…er to prevent spoil, materials, tools or objects of any kind from falling into trenches more than 1.30 metres deep, the trenches must be surrounded by plinths at least 15 centimetres high or have a sh…
After a period of rain or frost, the slope of the excavation or trench is examined. If necessary, the shoring is consolidated. The employer shall have this examination carried out by a competent perso…
Trenches and excavations are equipped with the necessary means for rapid evacuation of workers.
Those parts of a building which are not available for site service and access to which is dangerous to people are clearly demarcated and visibly signposted. Access to them is prevented by physical mea…
When workers are required to cross a trench more than 40 centimetres wide, means of passage are put in place.
When the various components of a shoring system are assembled outside the excavation, the height of these components is at least equal to the total depth of the excavation. To avoid any tipping over o…
The connection to a drinking water distribution network must be made in such a way as to ensure an adequate supply to the various water points provided in the workers' quarters.
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More