Article R4226-19
The results of the inspections provided for in articles R. 4226-14 and R. 4226-16, together with details of the work and modifications carried out to remedy any defects found, are recorded in a regist…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 11471–11480 of 23464 articles for “Art. 4 B”
The results of the inspections provided for in articles R. 4226-14 and R. 4226-16, together with details of the work and modifications carried out to remedy any defects found, are recorded in a regist…
Initial verification is carried out by an accredited body.
…is lodged remains silent for more than four months on a decision taken in application of article R. 4216-33, the decision is deemed to have been rejected.
The internal layout of the buildings referred to in Article R. 4216-24 is such as to limit the spread of fire and smoke, in particular by cross-cutting or compartmentalisation. The interior fittings o…
…s to comply with: 1° The provisions relating to the prevention of explosions set out in articles R. 4227-42 et seq.; 2° The provisions of article R. 4215-12; 3° Les dispositions spécifiques de l'arrêt…
Natural smoke extraction systems consist of one or more openings at the top and bottom communicating with the outside, for smoke extraction and air supply. The total surface area of the smoke extracti…
…is located on the ground floor and has a sufficient number of exits, as provided for in article R. 4216-8, which are accessible to disabled people; 2° It has at least two compartments, as referred to…
The references of the approved installation standards applicable to electrical installations are published in the Journal officiel de la République française by order of the ministers responsible for…
…e installations, substances and preparations used, the processes and any interactions between them; 4° The extent of the foreseeable consequences of an explosion.
Premises or locations where the presence of accessible hazardous live parts is the result of a technical necessity inherent in the operating principles of the equipment or installations are also consi…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More