Article R342-12-2
The periodic inspection referred to in article R. 342-12-1 concerns the adequacy of the safety management system in relation to the safety issues of the operation. The operator shall have it carried o…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 3541–3550 of 26223 articles for “Art. 477 to 494”
The periodic inspection referred to in article R. 342-12-1 concerns the adequacy of the safety management system in relation to the safety issues of the operation. The operator shall have it carried o…
When they choose to submit their safety management system to periodic inspection under the conditions set out in article R. 342-12-2, operators must inform the Prefect. They shall have an initial insp…
…e project manager is chosen for the project, independent of the client, the builder(s) and the operator of the installation.
The approvals referred to in articles R. 342-5 and R. 342-15 may stipulate that the work carried out by their beneficiaries is limited to certain categories of equipment and certain categories of chec…
Articles R. 2241-8 to R. 2241-10, R. 2241-12 to R. 2241-15, R. 2241-17 and R. 2241-18, R. 2241-21 to R. 2241-26 and R. 2241-30, R. 2241-34 to R. 2241-36 are applicable to ski lift and conveyor service…
…the duties of the project manager mentioned in article R. 342-4 must first be approved by the director of the technical service for ski lifts and guided transport. This approval is issued for a maxim…
Each inspection gives rise to a report indicating the non-conformities observed and the improvements to be made, which is sent by its author to the operator and to the Prefect within two months of the…
New ski lifts and conveyors, as well as substantial modifications to them, are designed and built in such a way that the overall level of safety in their operation for users, staff and third parties i…
The constructors, prime contractors, contracting authorities and operators of ski lifts and moving walkways are each responsible for ensuring that the installations or equipment are built, maintained…
The operator must ensure the safety of users, staff and third parties throughout the operation of its facilities. To this end, he must draw up a safety management system for each group of installation…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More