Article R4514-3
The social and economic committee of the competent user undertaking shall, if it considers it necessary, instruct one or more of its members belonging to the staff delegation to take part in the prior…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 7891–7900 of 33489 articles for “Art. 815-3”
The social and economic committee of the competent user undertaking shall, if it considers it necessary, instruct one or more of its members belonging to the staff delegation to take part in the prior…
The employer shall ensure that the methods and conditions of intervention and performance of the work are recorded in each worker's individual hyperbaric logbook, as referred to in Article R. 4461-10.
For the application of this chapter, the Regional Director for Enterprise, Competition, Consumer Affairs, Labour and Employment or the authority that replaces him pursuant to Articles R. 8111-8 and R.…
The prior declaration is sent to the labour inspector and to the bodies mentioned in article L. 4532-1 with territorial jurisdiction over the location of the operation. It shall be sent on the date of…
Repetitive loading or unloading operations are those involving products or substances of the same nature, carried out at the same locations, using the same operating procedures and employing the same…
Undercutting may only be carried out using mechanically powered equipment and provided that it does not result in any danger to workers. When such work is carried out, measures must be taken to preven…
In order to prevent spoil, materials, tools or objects of any kind from falling into trenches more than 1.30 metres deep, the trenches must be surrounded by plinths at least 15 centimetres high or hav…
Spoil or material may only be deposited along a trench more than 1.30 metres deep if it is possible to create a berm at least 40 centimetres wide. This berm must be kept clear of any deposits at all t…
After a period of rain or frost, the slope of the excavation or trench is examined. If necessary, the shoring is consolidated. The employer shall have this examination carried out by a competent perso…
Trenches and excavations are equipped with the necessary means for rapid evacuation of workers.
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More