Article D2171-9
…building permit and other administrative authorisations, as well as assistance to the project owner during their examination.
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 9881–9890 of 34927 articles for “Art. Aut. conc. n° 22-D-10 du 12 Apr 2022”
…building permit and other administrative authorisations, as well as assistance to the project owner during their examination.
…° Execution studies;4° Supervision of the execution of the works;5° Assistance to the project owner during the acceptance procedures and during the period of the guarantee of perfect completion.This w…
The purpose of the final preliminary design studies is to:1° Determine the detailed surface areas of all the elements of the programme;2° Establish the dimensions of the work and its appearance in pla…
The purpose of the preliminary design studies is to :1° Specify the general composition in terms of plan and volume;2° Assess the internal volumes and external appearance of the structure;3° Propose p…
The project management team is responsible for monitoring the execution of the works and, where appropriate, for supervising them.The purpose of monitoring the execution of the works is, firstly, to e…
…guarantee. It is therefore involved in:1° Pre-acceptance operations;2° Monitoring reservations made during acceptance of the works until they are lifted;3° Examining defects reported by the project ow…
The purpose of the design studies is to :1° To propose one or more overall solutions, reflecting the major elements of the programme, and to indicate the timescales for completion;2° To check the feas…
For new housing developments, the preliminary design and final design studies may be carried out in a single design phase.
The execution studies enable the work to be carried out. The purpose of these studies is to draw up all the execution plans and specifications for use on the site, as well as the corresponding summary…
…d in return for the commission of a still image, or a series of images with the same subject and produced in the same location, is determined on the basis of the time required to carry out the commiss…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More