Article R342-4
For the construction or substantial modification of a ski lift or a conveyor belt, a single project manager is chosen for the project, independent of the client, the builder(s) and the operator of the…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 2271–2280 of 48297 articles for “Art. Brussels I bis Regulation”
For the construction or substantial modification of a ski lift or a conveyor belt, a single project manager is chosen for the project, independent of the client, the builder(s) and the operator of the…
The approvals referred to in articles R. 342-5 and R. 342-15 may stipulate that the work carried out by their beneficiaries is limited to certain categories of equipment and certain categories of chec…
Articles R. 2241-8 to R. 2241-10, R. 2241-12 to R. 2241-15, R. 2241-17 and R. 2241-18, R. 2241-21 to R. 2241-26 and R. 2241-30, R. 2241-34 to R. 2241-36 are applicable to ski lift and conveyor service…
From 1st January 2009, any person performing the duties of the project manager mentioned in article R. 342-4 must first be approved by the director of the technical service for ski lifts and guided tr…
Each inspection gives rise to a report indicating the non-conformities observed and the improvements to be made, which is sent by its author to the operator and to the Prefect within two months of the…
New ski lifts and conveyors, as well as substantial modifications to them, are designed and built in such a way that the overall level of safety in their operation for users, staff and third parties i…
The constructors, prime contractors, contracting authorities and operators of ski lifts and moving walkways are each responsible for ensuring that the installations or equipment are built, maintained…
The operator must ensure the safety of users, staff and third parties throughout the operation of its facilities. To this end, he must draw up a safety management system for each group of installation…
Any modification likely to affect the safety of a ski lift or conveyor belt must be declared to the prefect at least one month before it is implemented. To this end, the project owner must send the Pr…
Except where the safety management system is subject to periodic inspection under the conditions laid down in article R. 342-12-2, its guidelines and any modifications to them must be approved by the…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More