Article R4227-54
The explosion protection document is drawn up before work begins and is revised when significant changes, extensions or alterations are made, particularly to the premises, work equipment or work organ…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 5401–5410 of 21091 articles for “Art. CA Paris 20-5-2009 n° 08-2432”
The explosion protection document is drawn up before work begins and is revised when significant changes, extensions or alterations are made, particularly to the premises, work equipment or work organ…
…way has a minimum passage width proportionate to the total number of people using it. This width is calculated on the basis of a standard passage unit of 0.60 metres. However, when a clearance has onl…
The employer shall subdivide the areas in which explosive atmospheres may occur into zones and shall ensure that the minimum requirements for the protection of workers are applied in these areas. Join…
The manufacturer undertakes to fulfil all the conditions necessary for the approved quality system to remain effective.
…period of ten years from the last date of manufacture, the elements to be transmitted with any application for assessment of the quality system listed in article R. 4313-44 as well as the decisions an…
…to whom the matter is referred remains silent for more than four months in the event of a hierarchical appeal.
…submitted to this procedure with the model which was the subject of the EC type-examination certificate and with the technical rules applicable to it.
…y or personal protective equipment on the market, certifying that it conforms to the relevant technical rules set out in the Annex at the end of this Title and has undergone the applicable conformity…
…11-7 or necessary to ensure that the samples of personal protective equipment comply with the technical rules applicable to them.The notified body, if it is not the body which issued the EC type-exami…
The notified body checks, by means of surveillance, that the manufacturer duly fulfils the obligations arising out of the approved quality assurance system.
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More