Article R4226-6
New permanent electrical installations, additions or structural modifications to existing permanent electrical installations and temporary electrical installations are carried out in accordance with t…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 4601–4610 of 16885 articles for “Art. CA Paris 29-6-2007 n° 05/17124”
New permanent electrical installations, additions or structural modifications to existing permanent electrical installations and temporary electrical installations are carried out in accordance with t…
The EC quality assurance system for production with surveillance is the procedure whereby a manufacturer: 1° has a quality assurance system approved by a notified body of his choice ; 2° entrusts this…
In order to assess the quality assurance system, the notified body shall carry out all necessary objective assessments of the elements of this system. In particular, it shall ensure that the system gu…
…re equipped with a sufficient number of seats and individual non-flammable cupboards. These lockers can hold two pairs of street clothes. Where work clothing is likely to be soiled with dangerous, dir…
…the manufacturer, importer or any other person responsible for placing it on the market of a technical file relating to the means implemented to ensure conformity with the applicable technical rules.…
The possibilities for complaint provided for in Article R. 4313-35 are applicable to the decisions of the notified body provided for in this paragraph.
…veillance authority or the regulated agent has information enabling it to consider that its identification would be likely to hinder the conduct or effectiveness of the inspection. During on-site insp…
…ect to this procedure conforms to the model which was the subject of the EC type-examination certificate and to the technical rules applicable to it.
…g to the quality of personal protective equipment; 2° the examinations, inspections and tests to be carried out by the manufacturer; 3° the means intended to verify the effective operation of the qual…
The notified body chosen by the manufacturer to assess the quality assurance system shall carry out the necessary checks to determine whether this system is such as to ensure conformity of production…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More