Article R4227-32
When necessary, a quantity of sand or loose earth proportionate to the size of the establishment, the layout of the premises and the nature of the work carried out is kept close to the work areas, wit…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 9701–9710 of 19551 articles for “Art. CE 28-5-2010 n° 330567”
When necessary, a quantity of sand or loose earth proportionate to the size of the establishment, the layout of the premises and the nature of the work carried out is kept close to the work areas, wit…
The general audible alarm is given per building if the establishment comprises several buildings isolated from each other.
Non-automatic extinguishing systems are easy to access and operate.
Extinguishing systems are permanently signposted in appropriate places.
If necessary, the establishment is equipped with armed fire taps, dry standpipes, wet standpipes, fixed automatic fire extinguishing systems or automatic fire detection systems.
…ater spray extinguisher with a minimum capacity of 6 litres for every 200 square metres of floor space. There is at least one appliance per level. Where premises present particular fire risks, particu…
Establishments in which more than fifty people may be occupied or habitually assembled, as well as those, regardless of their size, where flammable materials mentioned in article R. 4227-22 are handle…
In all underground structures, the risks of landslides or falling boulders are prevented, using methods appropriate to the height of the structure: 1° Either by means of a supported or suspended suppo…
When an underground shaft or gallery is to be lined with masonry or concrete, the elements of the support system are removed only as the work progresses and only insofar as, having regard to the stabi…
…the roofs of the latter, as well as any consolidation work carried out or support systems put in place, are examined: 1° Upon resumption of each work shift, over the entire height of the shafts and ov…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More