Article R4532-61
When drawing up the specific safety plan, the subcontractor shall take into account the information provided by the contractor, in particular that contained in the general coordination plan. He shall…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 4651–4660 of 16352 articles for “Art. CE 29-6-2020 n° 434521”
When drawing up the specific safety plan, the subcontractor shall take into account the information provided by the contractor, in particular that contained in the general coordination plan. He shall…
In order to ensure that the coordinator has the authority and resources needed to carry out his duties properly, the project owner shall, from the preliminary design stage, provide for cooperation bet…
A contractor who has all or part of the contract entered into with the project owner performed by one or more subcontractors must provide the subcontractors with: 1° A copy of the general coordination…
From receipt of the contract signed by the contractor, the subcontractor has at least thirty days to draw up the specific safety plan. This period is reduced to eight days for finishing work in the ca…
…° Safety instructions, particularly those relating to the loading or unloading operation; 2° The place of delivery or pick-up, access and parking arrangements at loading or unloading points, accompani…
Where rescue and evacuation arrangements are covered by the general coordination plan, the specific safety plan may refer to the general coordination plan.
…on measures decided by the coordinator and listing the site installations and the equipment and devices planned for carrying out the operation, the plan mentions, distinguishing between them: 1° The s…
The specific safety plan : 1° Carries out a detailed analysis of the construction and execution processes and the operating methods used, insofar as they have a particular impact on the health and saf…
…gangways or any other installations, must be enclosed or closed off : 1° Either by a guardrail placed at a height of 90 cm and a plinth at least 15 cm high; 2° Or by a temporary jointed floor suitab…
The identification and selection of external companies by the user company is based on the following three cumulative criteria: 1° The nature of the particular risks associated with the work and likel…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More