Article R4227-13
…exit and the way to the nearest safe waiting area or equivalent area. Other signs identify these areas.Clearances that are not normally used as passageways during working hours are marked with the wor…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 1681–1690 of 23743 articles for “Art. Cass. 13 March 2008 – counterfeit as dispossession”
…exit and the way to the nearest safe waiting area or equivalent area. Other signs identify these areas.Clearances that are not normally used as passageways during working hours are marked with the wor…
…ctive cleaning. The employer shall ensure that toilets and urinals are cleaned and disinfected at least once a day.
No permanent workstation may be located in the vicinity of a projection zone for hazardous materials.
All work equipment is fitted with the necessary controls to enable it to be shut down safely.
Where the results of the risk assessment show that the quantities in which a hazardous chemical agent is present in the workplace present only a low risk to the health and safety of workers and that t…
If a worker is found to be suffering from an infection or disease listed in an occupational disease table and which may be the result of exposure to biological agents, all workers likely to have been…
…d procedures for accreditation of the certification bodies mentioned in Article R. 4412-129 on the basis of the technical reference system of the body responsible for accreditation ; 2° The procedures…
The latest versions of demolition, removal or encapsulation plans, in any medium, are communicated once a quarter to the occupational physician and to the social and economic committee.
…ut the work provided for in this sub-section if it holds a certificate issued by that State on the basis of a reference system offering guarantees similar to those resulting from this paragraph and at…
The demolition, removal or encapsulation plan is made available on the site of the operation, on any suitable medium, and may be consulted by :1° The members of the social and economic committee ;2° T…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More