Article R4312-4
…new, are subject to the technical rules of design and construction set out in Annex I to Article R. 4312-1. However, protective structures conforming to decree no. 90-490 of 15 June 1990 and other saf…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 7031–7040 of 35538 articles for “Art. Cass. 1re civ. – 4 Apr. 2024 – no. 21-22.949”
…new, are subject to the technical rules of design and construction set out in Annex I to Article R. 4312-1. However, protective structures conforming to decree no. 90-490 of 15 June 1990 and other saf…
Communal changing rooms and washrooms are ventilated in accordance with the ventilation and sanitation rules in Chapter II and are suitably heated.
The injunctions and information referred to in articles R. 4231-1 and R. 4231-2 shall be issued by any means capable of giving them a date certain.
…mination certificate may be the subject of a complaint under the conditions laid down in article R. 4313-35.
…ine the proposed modifications and decide whether it continues to meet the provisions of Article R. 4313-45. The decision is notified and may be the subject of a complaint under the conditions laid do…
When the worker hooks or unhooks a load by hand, the work is organised in such a way that these operations can be carried out in complete safety. During these operations, the lifting equipment may not…
Where necessary, the employer shall provide workers with appropriate personal protective equipment and, where the particularly unhealthy or dirty nature of the work so requires, appropriate work cloth…
Remotely controlled self-propelled mobile work equipment must be fitted with a device enabling it to stop automatically when it leaves the field of control. If it is liable to collide with workers, su…
In the event of a partial or complete failure of the power supply, and if the work equipment used to lift non-guided loads cannot hold these loads, measures are taken to avoid exposing workers to the…
Where lifting equipment travels on tracks or runways, the ends of these tracks or runways are fitted with devices to reduce shocks at the end of travel.
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More