Article R774-10
…ht-hand column of the same table:Applicable articlesIn the wording resulting from the decreeR. 519-1n° 2012-101 of 26 January 2012R. 519-2 to R. 519-4 with the exception of IIINo. 2019-1098 of 29 Octo…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 2531–2540 of 57408 articles for “Art. Cass. 3ème civ. 26-1-2022 n° 20-20.223 FS-B”
…ht-hand column of the same table:Applicable articlesIn the wording resulting from the decreeR. 519-1n° 2012-101 of 26 January 2012R. 519-2 to R. 519-4 with the exception of IIINo. 2019-1098 of 29 Octo…
…alary costs reimbursed pursuant to article L. 1613-5 include all remuneration defined by the décret n°85-730 du 17 juillet 1985 relatif à la rémunération des fonctionnaires de l'Etat et des fonctionna…
Any employer planning to carry out earthworks, excavations, drilling or excavation work must find out from the relevant road authority in the case of work on public property, from the owner in the cas…
Where the operator has made it known in writing that he is unable, for a reason he considers to be imperative, to de-energise the electrical line, pipe or installation in the vicinity of which the wor…
When earthworks, excavations, drillings or recesses are to be carried out in the vicinity of underground electrical conduits of any class, the route of the conduits and the location of the installatio…
Any employer who intends to carry out work in the vicinity of electrical lines or installations shall obtain information from the operator, whether the local representative of the energy distribution…
To determine the minimum distances to be observed in relation to normally energised bare conductive parts, account must be taken of: 1° All possible movements of the energised bare conductive parts of…
In the event of disagreement between the employer and the operator, either as to whether it is possible to de-energise the installation or, if de-energisation is recognised to be impossible, as to the…
In application of the provisions of this sub-section and prior to the start of the work, the employer: 1° Shall have the necessary protective devices installed; 2° Shall inform the workers, by means o…
When earthmoving, transport, lifting or handling equipment must be used or moved in the vicinity of an electricity line, installation or pipeline of any class, and the operator, for a reason he consid…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More