Article R4534-31
In order to prevent spoil, materials, tools or objects of any kind from falling into trenches more than 1.30 metres deep, the trenches must be surrounded by plinths at least 15 centimetres high or hav…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 9721–9730 of 57821 articles for “Art. Cass. 3e civ. 3-2-2010 n° 08-21.333”
In order to prevent spoil, materials, tools or objects of any kind from falling into trenches more than 1.30 metres deep, the trenches must be surrounded by plinths at least 15 centimetres high or hav…
Spoil or material may only be deposited along a trench more than 1.30 metres deep if it is possible to create a berm at least 40 centimetres wide. This berm must be kept clear of any deposits at all t…
After a period of rain or frost, the slope of the excavation or trench is examined. If necessary, the shoring is consolidated. The employer shall have this examination carried out by a competent perso…
Trenches and excavations are equipped with the necessary means for rapid evacuation of workers.
When workers are required to cross a trench more than 40 centimetres wide, means of passage are put in place.
When the various components of a shoring system are assembled outside the excavation, the height of these components is at least equal to the total depth of the excavation. To avoid any tipping over o…
Shoring, struts and props may only be removed when effective protective measures have been taken against the risk of rockfall.
The connection to a drinking water distribution network must be made in such a way as to ensure an adequate supply to the various water points provided in the workers' quarters.
Measures, such as the digging of culverts and the installation of drains, are taken to limit infiltration from run-off water. In addition, measures such as the installation of pumps are planned to rem…
Failure to comply with the provisions of article L. 3341-4 and its implementing regulations is punishable under the conditions set out in article R. 234-7 of the Highway Code.
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More