Article R721-34
A Government Commissioner, appointed by the Minister for the Economy, performs the duties defined by Articles D. 615-1 to D. 615-8 of this Code for the Institut d'émission d'outre-mer, with the except…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 3621–3630 of 49594 articles for “Art. Cass. 3e civ. 4-3-1998 n° 96-16.671”
A Government Commissioner, appointed by the Minister for the Economy, performs the duties defined by Articles D. 615-1 to D. 615-8 of this Code for the Institut d'émission d'outre-mer, with the except…
Undercutting may only be carried out using mechanically powered equipment and provided that it does not result in any danger to workers. When such work is carried out, measures must be taken to preven…
In order to prevent spoil, materials, tools or objects of any kind from falling into trenches more than 1.30 metres deep, the trenches must be surrounded by plinths at least 15 centimetres high or hav…
Spoil or material may only be deposited along a trench more than 1.30 metres deep if it is possible to create a berm at least 40 centimetres wide. This berm must be kept clear of any deposits at all t…
After a period of rain or frost, the slope of the excavation or trench is examined. If necessary, the shoring is consolidated. The employer shall have this examination carried out by a competent perso…
Trenches and excavations are equipped with the necessary means for rapid evacuation of workers.
When workers are required to cross a trench more than 40 centimetres wide, means of passage are put in place.
When the various components of a shoring system are assembled outside the excavation, the height of these components is at least equal to the total depth of the excavation. To avoid any tipping over o…
Shoring, struts and props may only be removed when effective protective measures have been taken against the risk of rockfall.
If a potentially explosive device is discovered, work in the vicinity is immediately halted until the competent authorities have removed the device.
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More