Article R4514-5
The following notices are displayed at the entry and exit points for user undertaking personnel: 1° The names and places of work of the members of the social and economic committee of the user underta…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 3521–3530 of 39275 articles for “Art. Décret 2013-392 du 10-5-2013”
The following notices are displayed at the entry and exit points for user undertaking personnel: 1° The names and places of work of the members of the social and economic committee of the user underta…
Openings or differences in level in the floor of a gallery, narrow passages, lowered vaults and any obstacles which may present a danger or hindrance to the movement of workers, vehicles or convoys ar…
The safety protocol includes the information needed to assess the risks of all kinds generated by the operation, as well as the prevention and safety measures to be observed at each stage of the opera…
When, for a building or civil engineering operation involving several companies and not belonging to the first or second category, it is planned to carry out work presenting particular risks included…
The technical files containing the information relating to the search for and identification of asbestos-containing materials provided for in articles R. 1334-22, R. 1334-27 and R. 1334-28 of the Publ…
The general coordination plan kept on site may be consulted by : 1° The members of the social and economic committees called upon to intervene on the site; 2° The works doctor; 3° The members of the i…
In the absence of sufficient lighting in galleries where vehicles or convoys are in use, workstations are indicated by highly visible lights and vehicles or convoys are fitted with: 1° A white light a…
The provisions of articles R. 4532-42 and R. 4532-47 to R. 4532-51 are applicable to the simplified general coordination plan and, as soon as it has been drawn up, to the plan drawn up in application…
Shafts in which ladders are used for descent, rest landings of sufficient size to accommodate at least two workers are set up no more than six metres apart. The flights may be vertical. Fixed handhold…
When the project owner appoints a coordinator for the construction phase, separate from the coordinator for the design, study and project development phase, this appointment is made before the start o…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More