Article D3142-13
In the absence of an agreement mentioned in article L. 3142-26, in order to terminate the leave early or to waive it in the cases provided for in article L. 3142-19, the employee must send a reasoned…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 3801–3810 of 64618 articles for “Art. I-3-2°”
In the absence of an agreement mentioned in article L. 3142-26, in order to terminate the leave early or to waive it in the cases provided for in article L. 3142-19, the employee must send a reasoned…
The location surveyor has the qualifications and resources required to carry out this task, as specified for each field of activity by the decrees referred to in II of article R. 4412-97. It carries o…
For the risk assessment, the employer estimates the level of dust corresponding to each work process and classifies them according to the following three levels:a) First level: dust with a value of le…
Waste is : 1° Collected as and when it is produced ; 2° Packaged in appropriate, closed packaging, with the labelling required by Decree no. 88-466 of 28 April 1988 relating to products containing asb…
The maximum duration of a shift shall not exceed two and a half hours. The maximum daily duration of shifts shall not exceed six hours.
For each exposed worker, the employer shall draw up an asbestos exposure sheet indicating : 1° The nature of the work performed, the characteristics of the materials and equipment involved, the period…
The survey report concludes either that asbestos-containing materials or products are not present or are present, and in the latter case specifies their nature, location and estimated quantity. The co…
I. - The client, the project manager or the owner of buildings by nature or by destination, equipment, materials or articles who decides on an operation involving risks of exposure of workers to asbes…
The location report completes the traceability and mapping documents relating to the furniture and buildings within its scope. The person referred to in the first paragraph of I of article R. 4412-97…
Waste of any kind likely to release asbestos fibres is packaged and treated in such a way as not to cause dust emissions during handling, transport, storage and warehousing.
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More