Article R4224-7
Tanks, basins and reservoirs are constructed, installed and protected in such a way as to ensure the safety of workers. Their installation or, failing that, their protective devices are such that they…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 5071–5080 of 50078 articles for “Art. I-7°”
Tanks, basins and reservoirs are constructed, installed and protected in such a way as to ensure the safety of workers. Their installation or, failing that, their protective devices are such that they…
Rooms reserved for traffic and rooms that are only occupied occasionally may be ventilated via adjacent rooms with non-specific pollution to which they open.
Electrical installations and the electrical equipment they contain are monitored and serviced at the appropriate times.
Sliding, revolving or upward-opening doors do not qualify as emergency doors. They are not considered as regulatory clearances. However, power-operated sliding doors which, in the event of failure of…
Appropriate sanitary facilities are provided for disabled workers.
Workstations located inside workplaces are protected from the sun's harmful rays either by the design of openings or by appropriate fixed or mobile protection.
The washbasins have drinking water. The water is temperature-controlled and distributed at a rate of one washbasin for every ten workers at most. Appropriate means of cleaning and drying or wiping are…
The stability of the scaffolding must be ensured. All scaffolding shall be constructed and installed in such a way as to prevent, during use, the displacement of any of its constituent parts in relati…
The load-bearing capacity of a scaffold is clearly marked on the scaffold and on each of its decks.
Appropriate protection against the risk of falls from a height and the risk of falling objects must be provided before access to any level of scaffolding during its assembly, dismantling or conversion…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More