Article 2372-4
If the beneficiary of the trust has acquired free disposal of the property or right assigned pursuant to Article 2372-3, he shall pay to the settlor, where the value mentioned in the penultimate parag…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 8551–8560 of 64163 articles for “Art. II-1°”
If the beneficiary of the trust has acquired free disposal of the property or right assigned pursuant to Article 2372-3, he shall pay to the settlor, where the value mentioned in the penultimate parag…
Property assigned pursuant to Article 2372-1 may subsequently be assigned to guarantee debts other than those mentioned in the constitutive act provided that the latter expressly so provides. The sett…
Shafts, hatches and chutes are fenced off. Walkways, cantilevered floors, raised platforms and their means of access are constructed, installed or protected in such a way that workers required to use…
Tanks, basins and reservoirs are constructed, installed and protected in such a way as to ensure the safety of workers. Their installation or, failing that, their protective devices are such that they…
The provisions of this chapter do not apply to the distribution of electrical energy governed by the law of 15 June 1906 on the distribution of energy. In the case of electrical traction installations…
Buildings housing workplaces have structures and strength appropriate to their use.
Indoor and outdoor workplaces are laid out in such a way as to allow safe movement of pedestrians and vehicles.
Electrical installations include all electrical equipment used for the production, conversion, distribution or use of electrical energy. Electrical installations are classified as follows, according t…
Temporary electrical installations subject to the provisions of this chapter include: 1° Installations such as those in structures, huts and stands located in fairgrounds, markets, amusement parks, ci…
Flying bridges or gangways for loading or unloading ships or boats are installed so as to form a rigid whole and are fitted with railings on both sides.
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More