Article R342-19
Articles R. 2241-8 to R. 2241-10, R. 2241-12 to R. 2241-15, R. 2241-17 and R. 2241-18, R. 2241-21 to R. 2241-26 and R. 2241-30, R. 2241-34 to R. 2241-36 are applicable to ski lift and conveyor service…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 2861–2870 of 66237 articles for “Art. III and IV”
Articles R. 2241-8 to R. 2241-10, R. 2241-12 to R. 2241-15, R. 2241-17 and R. 2241-18, R. 2241-21 to R. 2241-26 and R. 2241-30, R. 2241-34 to R. 2241-36 are applicable to ski lift and conveyor service…
…d in article R. 342-4 must first be approved by the director of the technical service for ski lifts and guided transport. This approval is issued for a maximum of five years under the conditions set o…
Each inspection gives rise to a report indicating the non-conformities observed and the improvements to be made, which is sent by its author to the operator and to the Prefect within two months of the…
New ski lifts and conveyors, as well as substantial modifications to them, are designed and built in such a way that the overall level of safety in their operation for users, staff and third parties i…
The constructors, prime contractors, contracting authorities and operators of ski lifts and moving walkways are each responsible for ensuring that the installations or equipment are built, maintained…
The operator must ensure the safety of users, staff and third parties throughout the operation of its facilities. To this end, he must draw up a safety management system for each group of installation…
…ed. To this end, the project owner must send the Prefect a file describing the planned modification and including, where applicable, the safety report provided for in Article 8 of Regulation (EU) 2016…
…ubject to periodic inspection under the conditions laid down in article R. 342-12-2, its guidelines and any modifications to them must be approved by the Prefect of the département in which the facili…
An order of the Minister responsible for transport may waive or derogate from the application of certain provisions of this subsection to cross-border ski lifts, provided that the legal framework for…
…Article L. 271-6 of the French Construction and Housing Code. For the purposes of article L. 1334-7, the lead exposure risk report must have bee…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More