Article R2431-15
…as a whole or for the public contracts concerned alone, is to:1° To draw up all the execution plans and specifications for use on the site, as well as the corresponding summary plans;2° To draw up a d…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 5951–5960 of 66237 articles for “Art. III and IV”
…as a whole or for the public contracts concerned alone, is to:1° To draw up all the execution plans and specifications for use on the site, as well as the corresponding summary plans;2° To draw up a d…
The provisions of articles R. 2431-12 to R. 2431-18 apply to the rehabilitation of building works.
…iminary design studies include the summary preliminary design studies defined in article R. 2431-21 and the final preliminary design studies defined in article R. 2431-22. Preliminary design studies a…
The purpose of the assistance provided to the project owner during the acceptance operations and during the period of the guarantee of perfect completion is:1° To organise the operations prior to acce…
…To propose one or more overall solutions reflecting the major elements of the functional programme and to present the general technical provisions envisaged;2° To indicate the provisional timescales…
…iminary design studies include the summary preliminary design studies defined in article R. 2431-10 and the final preliminary design studies defined in article R. 2431-11.The preliminary design studie…
…s, depending on the method of awarding public contracts;2° To prepare the selection of applications and to examine them;3° To analyse the tenders and, where appropriate, the variants;4° To prepare the…
…of managing the performance of public works contracts is :1° Ensuring that the execution documents and the works in progress comply with the provisions of the studies carried out;2° Ensuring that the…
…plete the project studies to ensure consistency, in particular by drawing up a summary of the plans and specifications and, where applicable, taking into account the provisions arising from an amended…
The purpose of site scheduling, coordination and management is respectively to:1° To analyse the basic tasks relating to design and works, to determine the sequence of these tasks and their critical p…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More