Article 1245-7
In the event of damage caused by a defect in a product incorporated into another, the producer of the component part and the producer who carried out the incorporation shall be jointly and severally l…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 6041–6050 of 34794 articles for “Art. III bis”
In the event of damage caused by a defect in a product incorporated into another, the producer of the component part and the producer who carried out the incorporation shall be jointly and severally l…
A product is any movable property, even if it is incorporated into a building, including the products of the soil, animal husbandry, hunting and fishing. Electricity is considered a product.
A producer, when acting in a professional capacity, is the manufacturer of a finished product, the producer of a raw material, the manufacturer of a component part.Any person acting in a professional…
In the absence of fault on the part of the producer, the producer's liability based on the provisions of this chapter shall be extinguished ten years after the very product which caused the damage was…
Services may only be engaged for a specific time, or for a specific undertaking. A hire of service, made without determination of duration, may always be terminated by the will of one of the contracti…
Liability actions brought against a subcontractor due to damage affecting a work or items of equipment of a work mentioned in articles 1792 and 1792-2 are prescribed by ten years from acceptance of th…
The contract for the hire of work is dissolved by the death of the workman, architect or contractor.
In addition to actions governed by articles 1792-3, 1792-4-1 and 1792-4-2, liability actions directed against builders designated in articles 1792 and 1792-1 and their subcontractors lapse after ten y…
Bricklayers, carpenters, locksmiths and other workmen who make contracts directly at prices made, are subject to the rules prescribed in this section: they are contractors in the part they deal with.
If the work is made up of several parts or by measure, the verification may be done by parts: it is deemed to be done for all the parts paid for, if the master pays the workman in proportion to the wo…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More