Article Annexe II
LASER OPTICAL RADIATIONThe physical exposure variables that are relevant from a biophysical point of view are chosen according to the wavelength and duration of the radiation emitted by the source. Mo…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 1941–1950 of 36520 articles for “Art. IV & V”
LASER OPTICAL RADIATIONThe physical exposure variables that are relevant from a biophysical point of view are chosen according to the wavelength and duration of the radiation emitted by the source. Mo…
The walls to be knocked down must first be cleared of any protruding wood or iron that is not sealed or that, although sealed, protrudes by more than two metres.
…subject to stress and whipping may result from their rupture or sudden release, or where their removal may have serious consequences for the stability of all or part of the construction, they may onl…
…nstructions appears to be compromised, measures, such as the installation of props, are taken to prevent any risk of collapse.
…ny other building element is carried out by pulling with metal cables, ropes or any other similar device, the area in which the section of wall or building element will collapse must be carefully deli…
The undermining of a structure by means of a mechanically driven machine is only authorised if it does not result in any danger.
As soon as the work requires the employment of ten workers, a team leader is assigned exclusively to supervise the work. At least one team leader is appointed for every ten workers. When work requires…
When demolition work is carried out at a height not exceeding 6 metres above ground level, the installation of a work floor is not compulsory, subject to the following provisions: 1° The work may only…
…rker may be entrusted with demolition or dismantling work for which he is not competent and which involves an abnormal risk for him or for the other workers on the site.
Protective helmets must be worn for demolition work.
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More