Article R4223-13
Enclosed work areas are heated during the cold season. The heating is operated in such a way as to maintain a suitable temperature and not to give rise to any noxious fumes.
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 2211–2220 of 61501 articles for “Art. L 144-13 · C. trav. Art. L 1224-1”
Enclosed work areas are heated during the cold season. The heating is operated in such a way as to maintain a suitable temperature and not to give rise to any noxious fumes.
…ident to workers. The characteristics to be met by new and existing automatic doors and gates, as well as the conditions for their maintenance and inspection, are defined by joint order of the ministe…
The capture and ventilation installations are designed in such a way that concentrations in the atmosphere are not dangerous at any point for the health and safety of workers and remain below the expo…
Premises of more than 300 square metres located on the ground and upper floors, blind premises of more than 100 square metres and those located in basements, as well as all staircases, are equipped wi…
The conditions of use and maintenance of emergency lighting are laid down by order of the ministers responsible for labour and agriculture.
Signage indicates the way to the nearest exit and the way to the nearest safe waiting area or equivalent area. Other signs identify these areas.Clearances that are not normally used as passageways dur…
In cases other than those mentioned in article R. 4311-12, a decree may make standards mandatory.
No permanent workstation may be located in the vicinity of a projection zone for hazardous materials.
If a worker is found to be suffering from an infection or disease listed in an occupational disease table and which may be the result of exposure to biological agents, all workers likely to have been…
In the case of demolition, the demolition plan provides for the prior removal of asbestos and asbestos-containing materials, except where this would pose a greater risk to workers than if the asbestos…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More