Article R4532-61
When drawing up the specific safety plan, the subcontractor shall take into account the information provided by the contractor, in particular that contained in the general coordination plan. He shall…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 4361–4370 of 42566 articles for “Art. L 152-6”
When drawing up the specific safety plan, the subcontractor shall take into account the information provided by the contractor, in particular that contained in the general coordination plan. He shall…
…to ensure that the coordinator has the authority and resources needed to carry out his duties properly, the project owner shall, from the preliminary design stage, provide for cooperation between the…
A contractor who has all or part of the contract entered into with the project owner performed by one or more subcontractors must provide the subcontractors with: 1° A copy of the general coordination…
For the host company, the safety protocol includes, in particular, the following information: 1° Safety instructions, particularly those relating to the loading or unloading operation; 2° The place of…
Where rescue and evacuation arrangements are covered by the general coordination plan, the specific safety plan may refer to the general coordination plan.
The specific safety plan : 1° Carries out a detailed analysis of the construction and execution processes and the operating methods used, insofar as they have a particular impact on the health and saf…
Openings in shafts, galleries with an incline of more than 45°, and openings such as those provided for the passage of lifts, or such as chimney shafts or trap doors, which may exist in the floors of…
The identification and selection of external companies by the user company is based on the following three cumulative criteria: 1° The nature of the particular risks associated with the work and likel…
The specific safety plan may be consulted for advice by the works doctor and members of the social and economic committees before any work is carried out on the site.
Applications for approval must include :- the name, legal status and address of the organisation ;- extract no. 3 from the criminal record of the head of the organisation, dated less than three months…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More