Article R4532-20
Co-ordination tasks are covered by specific written contracts or amendments. It is paid for separately. The remuneration takes into account, in particular, the time spent on site by the coordinator an…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 5931–5940 of 59838 articles for “Art. L. n° 2022-297 du 2 mars 2022”
Co-ordination tasks are covered by specific written contracts or amendments. It is paid for separately. The remuneration takes into account, in particular, the time spent on site by the coordinator an…
…g, servicing or maintenance work on buildings by destination, including those mentioned in Article 524 of the Civil Code, provided that they are subject to the conditions for the installation of work…
For operations in the first and second categories, the ability to coordinate is distinct for the design, study and development phase of the project and for the construction phase.
…of the trench must be shored, braced or propped if their walls are vertical or substantially vertical. The walls of other trenches, as well as those of excavations or mounds, must be designed to preve…
A natural person is deemed to be competent to perform the role of coordinator during the design, study and project development phase of the work if he can provide evidence of :1° Professional experien…
…n completion of the corresponding training, the certificate of competence corresponding to that level.If he holds one of the diplomas referred to in 1° of article R. 4532-25 or article R. 4532-26, the…
…shoring, struts and props of trench excavations or excavations, account shall be taken of overloads due to constructions or deposits of any kind, such as miscellaneous materials, spoil, equipment, exi…
…ngineering operations subject to the obligation to make a prior declaration provided for in Article L. 4532-1 are those for which the foreseeable number of workers must exceed twenty at any one time d…
At the request of the Labour Inspectorate, the project owner must provide proof of the competence of the coordinator he has appointed.
Where overhanging parts of a property cannot be demolished, appropriate measures, such as shoring and consolidation, are taken to prevent them from collapsing.
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More