Article R4534-25
…shoring, struts and props of trench excavations or excavations, account shall be taken of overloads due to constructions or deposits of any kind, such as miscellaneous materials, spoil, equipment, exi…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 3941–3950 of 52691 articles for “Art. Loi 2022-172 du 14-2-2022”
…shoring, struts and props of trench excavations or excavations, account shall be taken of overloads due to constructions or deposits of any kind, such as miscellaneous materials, spoil, equipment, exi…
…L. 4532-1 are those for which the foreseeable number of workers must exceed twenty at any one time during the work and the duration of which must exceed thirty working days, as well as those for whic…
At the request of the Labour Inspectorate, the project owner must provide proof of the competence of the coordinator he has appointed.
Where overhanging parts of a property cannot be demolished, appropriate measures, such as shoring and consolidation, are taken to prevent them from collapsing.
A loading or unloading operation is defined as the activity involved in placing or removing products, funds and valuables, equipment or machinery, waste, objects and materials of any kind on or in a r…
A site access road is built to allow vehicles and pedestrians to reach at least one point within the site perimeter. This road is extended into the site by other roads allowing workers to access the a…
…abour Inspectorate, the Occupational Physician, agents of the Organisme Professionnel de Prévention du Bâtiment et des Travaux Publics, the prevention department of social security organisations and m…
Shoring, struts and props are installed as soon as work progresses.
The provisions of this section apply to the assembly and dismantling of lifts, without prejudice to those of Title III of this book.
…the installation or removal of lift traction cables; 2° Require the use of powered-ventilated individual respiratory protection equipment.
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More