Article R4452-29
When exposure in excess of the limit values is detected or when individual monitoring reveals that a worker is suffering from a disease or abnormality likely to result from exposure to artificial opti…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 4511–4520 of 53859 articles for “Art. R 134-2”
When exposure in excess of the limit values is detected or when individual monitoring reveals that a worker is suffering from a disease or abnormality likely to result from exposure to artificial opti…
A copy of the exposure sheet is given to the company doctor. It is made available to the Labour Inspectorate on request.
The relative pressure considered by this chapter is the absolute pressure at the level of the worker's airways, at the moment when it reaches its maximum value during the working time, less the local…
Each worker concerned is informed of the existence of the exposure sheet and has access to the information it contains.
The provisions of this Title do not apply to work relating to shipbuilding and ship repair.
When handling explosive substances or articles known to be sensitive to static discharges, in order to reduce the possibility of potential discharges, such handling should be organised in such a way a…
The electrical installation in each building or premises where pyrotechnic activities are carried out must include a device enabling the power supply to the building or premises to be cut off in an em…
The employer must ensure that the heads of departments and the heads of workshops, laboratories or worksites have the necessary competence and authority to organise and direct, in accordance with this…
Receipts are arranged in such a way that workers responsible for loading or unloading operations are not obliged to lean over the empty space in order to pull the load. However, for the loading or unl…
Trees, boulders, equipment, materials and objects of any kind in the vicinity of the site where excavations are being undertaken must be removed or securely held when it appears that their equilibrium…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More