Article R4523-15
Meetings of the health, safety and working conditions committee of the user undertaking in an extended formation are held separately from those of the committee in an ordinary formation. The agenda fo…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 9251–9260 of 60179 articles for “Art. R 145-29-1”
Meetings of the health, safety and working conditions committee of the user undertaking in an extended formation are held separately from those of the committee in an ordinary formation. The agenda fo…
When a worksite usually involves a large movement of lorries or other transport vehicles, specially reserved and appropriately signposted tracks will be laid for these vehicles.
A legal entity able to assign a competent natural person to this role may be appointed as coordinator.
It is forbidden to work under the body of a lorry or under a moving part of a construction machine without using an appropriate device to prevent an accident in the event of failure of the normal rest…
All equipment, machinery, installations and protective devices of any kind used on a worksite are examined before being put into service or recommissioned to ensure that they comply with the provision…
Jacks are fitted with a device capable of preventing the crank from turning back.
The design of shoring with a height of more than six metres is justified by a calculation note and its construction is carried out in accordance with an assembly plan drawn up in advance, except in ca…
Breathing equipment preventing the inhalation of noxious vapours or dusts is made available to workers who carry out welding, riveting or cutting work on components coated with lead-based paint, as we…
When carrying out construction work involving the use of heavy prefabricated elements, the stability of each of these elements is ensured, as soon as they are in place, by appropriate rigid devices. R…
Welding, riveting and sandblasting work may only be carried out by competent workers. Personal protective equipment, such as gloves, gaiters or leggings, aprons or protective waistcoats, "pile support…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More