Article R4212-7
In an instruction manual sent to the employer, the project manager specifies the measures taken for ventilation and sanitation of the premises and the information required for maintaining the installa…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 9881–9890 of 61947 articles for “Art. R 315-31 and R 315-32”
In an instruction manual sent to the employer, the project manager specifies the measures taken for ventilation and sanitation of the premises and the information required for maintaining the installa…
The provisions of this Title determine, pursuant to Article L. 4211-1, the rules to be complied with by the client undertaking the construction or fitting out of buildings intended to accommodate work…
Every precaution is taken when installing ventilation, collection or recycling equipment to allow for regular maintenance and subsequent checks on its efficiency.
The internal walls of air supply circuits do not contain materials that can disintegrate or decompose, emitting dust or substances that are hazardous to workers' health.
In premises with non-specific pollution as defined in article R. 4222-3, the client: 1 Provides a filtration system for new air when there is a risk of pollution of this air by solid particles and its…
For the purposes of this Title, "workplaces" means places intended to accommodate workstations, whether or not located in the buildings of the establishment, and any other place within the area of the…
Ventilation systems are designed to : 1° Ensure that the air is renewed at all points in the premises; 2° Do not cause discomfort in the work areas, in particular as a result of air speed, temperature…
The client provides for the introduction of a minimum airflow into the sanitary rooms, determined by the following table: DESIGNATION OF PREMISESMINIMUM FLOWof air introduced(in cubic metresper hour a…
When appointing inspectors and controllers to carry out the control missions provided for in article L. 1421-1 of this Code and article L. 313-13 of the Code de l'action sociale et des familles, the D…
A member of staff may only be appointed as an inspector if he/she meets one of the following conditions: 1° Holds a bachelor's degree or a diploma or qualification classified at least at level II; 2°…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More