Article R4534-32
Spoil or material may only be deposited along a trench more than 1.30 metres deep if it is possible to create a berm at least 40 centimetres wide. This berm must be kept clear of any deposits at all t…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 3231–3240 of 47874 articles for “Art. R 642-3”
Spoil or material may only be deposited along a trench more than 1.30 metres deep if it is possible to create a berm at least 40 centimetres wide. This berm must be kept clear of any deposits at all t…
After a period of rain or frost, the slope of the excavation or trench is examined. If necessary, the shoring is consolidated. The employer shall have this examination carried out by a competent perso…
Trenches and excavations are equipped with the necessary means for rapid evacuation of workers.
Those parts of a building which are not available for site service and access to which is dangerous to people are clearly demarcated and visibly signposted. Access to them is prevented by physical mea…
In carrying out their duties, the members of the inter-company occupational health and safety committee may make observations and recommendations and propose preventive action.
The Social and Economic Committee may call upon the expert in technological risks mentioned in article L. 4523-5 in the event of serious danger in connection with the classified installation. The expe…
When workers are required to cross a trench more than 40 centimetres wide, means of passage are put in place.
When the various components of a shoring system are assembled outside the excavation, the height of these components is at least equal to the total depth of the excavation. To avoid any tipping over o…
Shoring, struts and props may only be removed when effective protective measures have been taken against the risk of rockfall.
The connection to a drinking water distribution network must be made in such a way as to ensure an adequate supply to the various water points provided in the workers' quarters.
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More