Article R2313-7
In application of articles L. 2313-1 et L. 2313-2, in the caisses des écoles of communes with 3,500 inhabitants or more and the caisses des écoles intercommunales comprising a commune with 3,500 inhab…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 2781–2790 of 68255 articles for “Art. s. L 313-7 and R 313-4”
In application of articles L. 2313-1 et L. 2313-2, in the caisses des écoles of communes with 3,500 inhabitants or more and the caisses des écoles intercommunales comprising a commune with 3,500 inhab…
The database provided for in article L. 2312-18 enables the information required for the three recurrent consultations provided for in article L. 2312-17 to be made available. All the information in t…
An assembly of machinery consisting of the assembly of a machine or tractor with interchangeable equipment is not required to satisfy the conformity certification procedure applicable to that assembly…
With the exception of those listed in article R. 4313-78, machinery is subject to the conformity assessment procedure with internal control of manufacture. Agricultural or forestry tractors and their…
The head of the user undertaking shall check with the heads of the external undertakings that they have given the workers instructions appropriate to the risks associated with the presence of several…
Before any work is carried out on the site, the contractor in charge of the main work or the main lot, as well as any contractor called upon to carry out work presenting particular risks included in t…
Where it has not been possible to apply a preventive measure provided for in the plan, the contractor shall indicate on the plan the means of at least equivalent effectiveness that have been implement…
An up-to-date copy of the specific safety plan is kept permanently available on site. The opinions of the occupational physician and the social and economic committee provided for in article R. 4532-6…
The specific safety plan kept on site may be consulted by : 1° The members of the inter-company college for safety, health and working conditions; 2° The members of the social and economic committee;…
The special safety plan kept on site is kept by the contractor for a period of five years from the date of acceptance of the work.
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More