Article R2431-10
The purpose of the preliminary design studies is:1° To specify the general composition in terms of plan and volume;2° To assess the internal volumes and external appearance of the structure;3° To prop…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 7431–7440 of 68978 articles for “Art. s. L. 145-1 to L. 145-60 + R. 145-1 to R. 145-38”
The purpose of the preliminary design studies is:1° To specify the general composition in terms of plan and volume;2° To assess the internal volumes and external appearance of the structure;3° To prop…
The purpose of project studies is :1° To specify, by means of plans, sections and elevations, the shapes of the various elements of the construction, the nature and characteristics of the materials an…
…he client with information about the state of the building and the feasibility of the operation, is to:1° Establish an inventory of fixtures;2° Provide a functional, urban planning, architectural and…
The execution studies enable the work to be carried out. Their purpose, for the work as a whole or for the public contracts concerned alone, is to:1° To draw up all the execution plans and specificati…
The purpose of the assistance provided to the project owner during the acceptance operations and during the period of the guarantee of perfect completion is:1° To organise the operations prior to acce…
The purpose of the assistance provided to the project owner for the award of public works contracts on the basis of studies approved by the project owner is:1° To prepare the consultation of the econo…
…ks in progress comply with the provisions of the studies carried out;2° Ensuring that the documents to be produced by the economic operators responsible for the works, and the execution of the works,…
…r the project is used by the project owner as the basis for inviting tenders from the economic operators responsible for the works.When the project owner selects a tender that includes a variant, the…
The purpose of site scheduling, coordination and management is respectively to:1° To analyse the basic tasks relating to design and works, to determine the sequence of these tasks and their critical p…
Where the concession contract provides for a procedure to verify the conformity of the services, it may stipulate that the payment period runs from the date on which this conformity is established, if…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More