Article R4163-12
Points are used up in accordance with the scale set out in article R. 4163-11 in increments of 10 points for the uses set out in 2° and 3° of this article and point by point for the use set out in 1°…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 8921–8930 of 10478 articles for “Art. 150 VI”
Points are used up in accordance with the scale set out in article R. 4163-11 in increments of 10 points for the uses set out in 2° and 3° of this article and point by point for the use set out in 1°…
Once the request to use the points has been made, the points corresponding to the use desired by the holder are reserved and cannot be allocated to another use until the decision of the body mentioned…
…ese agents will carry out all documentary and on-site checks on the accuracy of the declarations provided with a view to determining employees' entitlements under the professional prevention account.…
…dings mentioned in article R. 4216-24 are accessible on at least one side to the fire and rescue services.
The staircases and lifts in the buildings referred to in article R. 4216-24 are: 1° Either enclosed in one-hour fireproof shafts with half-hour fireproof doors and, in the case of staircases, a smoke…
In order to take account of the increased risks in the event of a disaster, buildings where the lowest floor of the top level is more than eight metres above the outside ground must have a fire-stable…
The provisions of this section apply taking into account the classification of construction materials and elements according to their behaviour in fire, as defined in articles…
…sible for labour, agriculture and construction defines the terms and conditions for applying the provisions of this section, in particular: 1° The characteristics of exits and the lateral isolation of…
The internal layout of the buildings referred to in Article R. 4216-24 is such as to limit the spread of fire and smoke, in particular by cross-cutting or compartmentalisation. The interior fittings o…
…pecifies in particular: 1° The breathing gases or gas mixtures authorised, in application of the provisions of sub-section 2 below; 2° The duration of intervention or performance of the work, taking i…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More