Article R744-10
…he wording of the decreeR. 214-32-9, R. 214-32-11 and R. 214-32-16 to R. 214-32-18n° 2013-687 of 25 July 2013R. 214-32-19n° 2020-1148 of 17 September 2020R. 214-32-20 excluding 4° of its In° 2019-1078…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 4791–4800 of 24154 articles for “Art. Cass. com. – 12 July 2016 – no. 14-23310”
…he wording of the decreeR. 214-32-9, R. 214-32-11 and R. 214-32-16 to R. 214-32-18n° 2013-687 of 25 July 2013R. 214-32-19n° 2020-1148 of 17 September 2020R. 214-32-20 excluding 4° of its In° 2019-1078…
…nd column of the same table:Applicable articlesIn the wording resulting from the decreeR. 519-1n° 2012-101 of 26 January 2012R. 519-2 to R. 519-4 with the exception of IIINo. 2019-1098 of 29 October 2…
…nd column of the same table:Applicable articlesIn the wording resulting from the decreeR. 519-1n° 2012-101 of 26 January 2012R. 519-2 to R. 519-4 with the exception of IIINo. 2019-1098 of 29 October 2…
…nd column of the same table:Applicable articlesIn the wording resulting from the decreeR. 519-1n° 2012-101 of 26 January 2012R. 519-2 to R. 519-4 with the exception of IIINo. 2019-1098 of 29 October 2…
Any employer planning to carry out earthworks, excavations, drilling or excavation work must find out from the relevant road authority in the case of work on public property, from the owner in the cas…
…l inform the workers of these measures by means of the instructions provided for in Article R. 4534-125.
Any employer who intends to carry out work in the vicinity of electrical lines or installations shall obtain information from the operator, whether the local representative of the energy distribution…
…i.e. whose voltage exceeds 50 volts, without exceeding 500 volts in alternating current, or exceeds 120 volts, without exceeding 750 volts in smooth direct current; 2° Located outside or inside premis…
To determine the minimum distances to be observed in relation to normally energised bare conductive parts, account must be taken of: 1° All possible movements of the energised bare conductive parts of…
…t he cannot de-energise this line or installation, the instructions provided for in article R. 4534-125 specify the measures to be taken to keep the line or installation out of the reach of workers. I…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More