Article R4453-11
When the results of the risk assessment show that the values triggering action are exceeded, the employer determines and implements the preventive measures and means provided for in Article R. 4453-13…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 2111–2120 of 36520 articles for “Art. IV & V”
When the results of the risk assessment show that the values triggering action are exceeded, the employer determines and implements the preventive measures and means provided for in Article R. 4453-13…
…acteristics of the electromagnetic field emissions present in the workplace ; 2° The exposure limit values and the values triggering action laid down in articles R. 4453-3 and R. 4453-4 ; 3° The resul…
…ters for labour and agriculture specifies the physical quantities represented by the exposure limit values mentioned in article R. 4453-3 and the values triggering action mentioned in article R. 4453-…
When carrying out a risk assessment, the employer shall rely on the competent employee(s) referred to in Article L. 4644-1 or, failing that, on the consultant and bodies referred to in the same articl…
…lds. The purpose of this assessment is in particular to: 1° To identify which of the exposure limit values and the values triggering action laid down in Articles R. 4453-3 and R. 4453-4 are relevant t…
…s of documentary data does not allow the conclusion to be drawn that there is no risk of the action values or exposure limit values being exceeded, the employer shall measure, calculate or digitally s…
…pecifies the conditions for measuring, calculating and digitally simulating electromagnetic field levels.
…if necessary, and before starting any earthworks, the employer must obtain information from the relevant road authority in the case of work on public property, or from the owner in the case of work on…
Trees, boulders, equipment, materials and objects of any kind in the vicinity of the site where excavations are being undertaken must be removed or securely held when it appears that their equilibrium…
Undercutting may only be carried out using mechanically powered equipment and provided that it does not result in any danger to workers. When such work is carried out, measures must be taken to preven…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More