Article R4543-3
The study shall be entrusted to a person competent in the field of risk prevention and familiar with the provisions applicable to the work referred to in Article R. 4543-1 as well as the regulatory pr…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 2141–2150 of 36520 articles for “Art. IV & V”
The study shall be entrusted to a person competent in the field of risk prevention and familiar with the provisions applicable to the work referred to in Article R. 4543-1 as well as the regulatory pr…
Except in the case provided for in article R. 4543-5, the specific safety study remains the property of the contractor. A copy is given to the owner of the equipment.
…ed. This summary may be produced using pictograms. Where the nature of the risk requires special preventive measures to be taken, the material safety data sheet refers, by any appropriate means, to co…
The material safety data sheet must be kept permanently available to the workers of the company working on the lift, either in the lift or goods lift machinery room, or in a nearby location in the cas…
The provisions of sections 2 to 6 of this chapter are applicable, without prejudice to those of Title I of this book, to inspection, maintenance and technical control work, as well as to repair and co…
For each piece of equipment used in the course of the work referred to in Article R. 4543-1, the specific safety study supplements the single risk assessment document of the company carrying out the w…
The technical inspection report defined in…
The personnel of the company carrying out the work have access to the specific safety study before the work is carried out.
The specific safety study is updated within six weeks of the occurrence of any event likely to affect the risk assessment, in particular: 1° In the event of a major conversion; 2° On receipt of the in…
…ed to enable the head of the company carrying out the work to define and implement the necessary preventive measures to ensure the safety and protect the health of the people carrying out the work. To…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More