Article R4534-25
In determining the inclination to be given to the walls or in establishing the shoring, struts and props of trench excavations or excavations, account shall be taken of overloads due to constructions…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 1761–1770 of 63520 articles for “Art. IV and V”
In determining the inclination to be given to the walls or in establishing the shoring, struts and props of trench excavations or excavations, account shall be taken of overloads due to constructions…
Where overhanging parts of a property cannot be demolished, appropriate measures, such as shoring and consolidation, are taken to prevent them from collapsing.
If a potentially explosive device is discovered, work in the vicinity is immediately halted until the competent authorities have removed the device.
Shoring, struts and props are installed as soon as work progresses.
Measures, such as the digging of culverts and the installation of drains, are taken to limit infiltration from run-off water. In addition, measures such as the installation of pumps are planned to rem…
…he operations or work requiring the use of more than one worker, according to their arduous, repetitive or complex nature. When two or more workers are involved, the manager of the company carrying ou…
…rrying out the work defines the operating procedures appropriate to the technology of the equipment and its environment. This organisation takes into account: 1° The consequences of the introduction o…
…d of the company carrying out the work must organise the work in such a way as to ensure the safety and health of the workers carrying it out.To this end, he must take the appropriate preventive measu…
…are running simultaneously in the same shaft, work on one of them is carried out when the others have been shut down, unless the separation between the equipment ensures the safety of those involved.
When the work requires the presence of a worker in the cab roof and the equipment is fitted with a control device for the inspection manoeuvre, the work may only be undertaken after verification of th…
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More