Article R4462-33
For the application of this chapter, the Regional Director for Enterprise, Competition, Consumer Affairs, Labour and Employment or the authority that replaces him pursuant to Articles R. 8111-8 and R.…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 2631–2640 of 45497 articles for “Art. Loi 2019-222 du 23-3-2019”
For the application of this chapter, the Regional Director for Enterprise, Competition, Consumer Affairs, Labour and Employment or the authority that replaces him pursuant to Articles R. 8111-8 and R.…
During the joint preliminary inspection, the head of the user undertaking: 1° Delimits the area in which the outside undertakings will be working; 2° Marks out the areas in this area which may present…
…29, the competent administrative authority shall ensure in particular that the organisational procedures and conditions meet the requirements laid down by the orders referred to in Article R. 4461-30…
The prior declaration is sent to the labour inspector and to the bodies mentioned in article L. 4532-1 with territorial jurisdiction over the location of the operation. It shall be sent on the date of…
Repetitive loading or unloading operations are those involving products or substances of the same nature, carried out at the same locations, using the same operating procedures and employing the same…
Undercutting may only be carried out using mechanically powered equipment and provided that it does not result in any danger to workers. When such work is carried out, measures must be taken to preven…
In order to prevent spoil, materials, tools or objects of any kind from falling into trenches more than 1.30 metres deep, the trenches must be surrounded by plinths at least 15 centimetres high or hav…
Spoil or material may only be deposited along a trench more than 1.30 metres deep if it is possible to create a berm at least 40 centimetres wide. This berm must be kept clear of any deposits at all t…
After a period of rain or frost, the slope of the excavation or trench is examined. If necessary, the shoring is consolidated. The employer shall have this examination carried out by a competent perso…
Trenches and excavations are equipped with the necessary means for rapid evacuation of workers.
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More